2017 ERATE UPS/Battery Backup RFP Q&A

Question(s) - For the list of questions below, please refer to the Equipment List posted below. The answer to each of these questions is found within that document.
  1. Equipment list?
  2. Type of power used by devices (120V or 208V)?
  3. Rack mounted? 2 or 4 post?
  4. PoE devices with %PoE to account for?
  5. Require battery independent Automatic Restart?